Earthwork
Agtek earthwork takeoffs
Cut/fill, mass and fine grading quantities, and stripping from surfaces built in Agtek.
Secondary service · Civil utility & sitework
Site packages priced from real quantities—cut/fill, grading, underground utilities, and paving—for GCs carrying site scope and for site contractors.
Overview
Sitework is where commercial budgets often drift. PenCo prices site packages from measured quantities rather than allowances, using Agtek for earthwork and on-screen takeoff for utilities, paving, and site concrete.
Chris Pendleton holds a B.S. in Civil Engineering and has heavy-civil experience including project engineering on a $2 billion PPP design-build bridges program with The Walsh Group, where he estimated change impacts and obtained MOT and AHJ permits.
Services
Earthwork
Cut/fill, mass and fine grading quantities, and stripping from surfaces built in Agtek.
Utilities
Storm, sanitary, and water quantities and pricing—pipe, structures, and trench work.
Paving
Asphalt and concrete paving, curb and gutter, sidewalks, and site concrete.
Packages
Full site bids or a check estimate on site-subcontractor numbers for a GC.
GC support
Level site sub bids and close scope gaps between site, utility, and building packages.
Budget
Conceptual site budgets for precon and GMP estimates.
Pricing
Sitework and earthwork estimates start from $1,000 and are quoted fixed-fee after a plan review. Send your civil drawings with your bid date.
FAQ
Civil grading plans (PDF or CAD), existing and proposed surfaces if available, geotechnical report, and the bid date.
Yes. Sitework can be estimated as part of a commercial GC bid or GMP budget, or as a standalone package.
Sitework and earthwork estimates start from $1,000 and are quoted fixed-fee after plan review.
Send your plans
Email your drawings, specs, addenda, and bid date for a fixed-fee quote.